Monday, January 21, 2008

Inside factory #4

This is the  tunnel that the open body's traveled through on their way to factory #01.  This tunnel started from the W.F. Stewart body works and traveled under Hamilton Avenue ending in factory #01. Photo is from Don Bent's book "A Place Called Buick".

Above and below are views Inside the W.F. Stewart factory #4.


These three views inside of factory #4 show (at top left) open body construction. The top right photo shows an open body being sent through the tunnel which ran under Hamilton Ave. north to factory #01 for paint. The bottom photo shows the turntable used for making closed body Buick's.


No comments:

Post a Comment