A 1998 view of the North Buick site with some main factory numbers. This shows the outline of (most of) the Buick property.
|
Sunday, March 11, 2012
Mapping The Buick Site.
Saturday, March 10, 2012
Factory #10.
Links:
St. Johns Industrial Park Urban Renewal near Buick
Buick Test Track During World War II.
Buick North-End 2008 - 2010
Liberator Engine work at Buick.
Factory #05/#10 War Work
Factory #10
Building #38 Warehouse
Work Safely Today - Tomorrow - Always.
| This is the same area (shown below on Leith Street) during a later strike. |
| Here we are facing west during a strike at Buick. That is bridge #20 in the foreground. Factory #11 is on the right. On the left is building #23 then factory #29 followed by #12-A and #12. The bridge in the distance carried axle assembly's from factory #31. In my time the far bridge carried axles to factory #04, which would date this photo after 1940 when the new axle plant was built. Buick had a strike just after the war so I'm thinking this is 1946. Factory #31 was first called 66-A because it was connected to factory #66 crankshaft plant. |
| This a a closeup of bridge #20 over Leith Street. This is the bridge that carried motors from factory #11 to factory #62. The Safety warnings are the same as shown in the 1934 Oak Park photo. |
| This east facing view in 2002 shows the overhead bridge conveyor that is shown in the photos above (distant one) being removed. This is a snip from the Leonard Thygesen documentary. |
Bridge #20
Leith Street Revisited Once Again.
Factory #31 During Construction
Oak Park Entrance 1934 - 2001.
Factory #29 Tool Factory.
Friday, March 9, 2012
Oak Park Entrance 1934 - 2001.
| This photo location and direction is the same as shown below, only in 2001. This is a still shot from a Leonard Thygesen film. |
| Add caption |
| This photo facing east shows the Oak Park entrance for the Buick factories in 1934. The closeup above has the message on the bridge as: WORK SAFELY TODAY-TOMORROW-ALWAYS |
Factory #09 Northeast Corner 1923
Buick Driveaway 1923
1968 Strike
Buick Hospital and Personal Welfare Department
Michigan Motor Casting Company
Work Safely Today - Tomorrow - Always.
Factory #12 1934.
| This is March 19, 1934 at 4:30 PM. This is factory #12 sheet metal stamping for Buick. |
| Looking at factory #12 (facing north) along Industrial Avenue. |
| South-end of factory #12 looking at the west wall. |
Factory #12 Sheet Metal Plant
Demolition At Buick.
![]() |
| This will be the last building left for demolition at the Buick site, (circled). It was part of the old factory #03 spring forge. This was saved from the wrecking ball and converted in 2003 into the Cultural & Diversity Center. This addition to factory #03 was built in 1966. "This will be the grand finale". |
![]() |
| This Leonard Thygesen still shot from his documentary film shows the location of building #55-A. X marks the spot. You are so right Leonard: sad. |
![]() |
| Leonard Thygesen says:They say a picture is worth a thousand words. I have just one....sad. |
![]() |
| Not much left now. |
![]() |
The end of building #55-A. Only one place left. A Leonard Thygesen update.
9:00 a.m. 55 water process.
|
Links:
Buick Demolition DVD.
Buick Demolition March 5, 2012
Building #55 Waste Treatment Plant.
The Cultural & Diversity Center
Thursday, March 8, 2012
Factory #12 War Work.
| This "well known" advertisement shows that almost anything was possible for Buick. The conversion of many factories, including factory #12, where these shell casings were manufactured, were up and running in record time. The last Flint built Buick off the end of the line was on February 3, 1942. Harlow Curtice (manager of Buick) was given advance notice from the government about many important projects to aid the war effort. This steel shell casing was considered one of the most important projects. The work of changing over the factories for the duration of the war, therefore, started as soon as the last car part was out of the building. After many failures the first successful test firing of these shells was done on May 1, 1943. News article |
![]() |
| This postcard shows the location of the factory shown below. This view is facing north. |
| This is factory #12 showing little change since this 1920's photo. This view from Industrial Avenue is facing north-east. In my time this was the "Oak Park" entrance. |
![]() |
| This photo of 20mm shells (cut in half) shows the wall thicknesses during the die stamping process. Buick also made these 20mm shells in factory #11. |
![]() |
| These are the different steps taken to make a shell casing of the right height and thickness. |
![]() |
| Creating the first "shallow cup" in a steel billet. "Notice the kiln next to the press". |
![]() |
| You will see many different heat treatments during the creation of the shell casing. |
![]() |
| These billets are just getting a little heat here. The temperature range during the whole process is 2,000 to 360 degrees. |
![]() |
| Steel cups being drawn for 37mm. shell. |
![]() |
| Heating the billet to 2,000 degrees. |
![]() |
| This billet is probably at it's 2,000 degree temperature. |
![]() |
| "Slowly but surely" the billet will expand.These early pressings are called "cupping". |
![]() |
| These old presses used for making fenders, hoods and other automobile parts, are now, hard at work forming the steel billets of the 75mm shell casing. |
![]() |
| A nice "pulled back" view of the old fender presses in action shaping the steel billets. |
![]() |
| The billet is steadily getting a longer and thinner shape. |
![]() |
| The billet is looking more like a shell casing. |
![]() |
| Between every pressing is another heat treat. |
![]() |
| Same as below. |
![]() |
| One of many pressings to achieve the final dimension. |
![]() |
| Rolling on the "Rim". |
![]() |
| Inspection after the rollers have placed the "rim" on these casings. |
![]() |
| Nearing the final shape. |
![]() |
| This method was sometimes used for moving to and from the numerous operations. |
![]() |
| This may be the phenolic varnish area but I'm not sure. |
![]() |
| One of many heat treating areas. The range of heat, from start to finish was 2,000 degrees to 360. |
![]() |
| Drilling for fuse placement. |
![]() |
| Not sure what is taking place here. |
![]() |
| This looks to be the area that bakes the phenolic varnish on. The heat was 360 degrees. |
![]() |
| Always inspecting. |
![]() |
| Looks like precision drilling for the fuse placement. The complete shells were not assembled at Buick. |
![]() |
| Add caption |
![]() |
| Plenty of inspection takes place during the numerous pressings, before you get to this point. This is before the finished taper has been rolled in. |
![]() |
| Final inspection of the 75mm shell casing in factory #12. |
![]() |
| Final inspection. |
![]() |
| Final inspection. |
![]() |
| Final inspection. |
![]() |
| Final inspection. |
Links:
Factory #12 Sheet Metal Plant
Factory #12/#16
Buick Driveaway 1923
Buick War Work
1968 Strike
Factory #12 Body Shop
Leith st. 2008
Oak Park Lot 2008
Factory #12 2002 -2008
Factory #12 Demolition Plus Inside
Factory #12 fender Drawman
Factory #12 Drawman Hood Press
Buick City Lee Furse 1985
Robogate
Factory #12 drawman 1966
Factory #12 1997
Factory #12 1925 Thru 2002
Factory #12 The Early Years