This view inside factory #44 during Buick City remodeling shows the first floor dip tanks being built. I believe this view is facing south west from near the entrance to factory #40/bldg #16. The raw body's would be submerged in these tanks after they had went through the second floor sealer line in factory #04 to get rust prevention and paint prep. |
No comments:
Post a Comment