This work went on in a building between factory #40 and #04. It was built in 1972 the year I hired in. A rail line plus trucks brought in the tires and wheels. When I was doing the shipping & receiving paperwork at 16 south dock this building was designated #08. When factory #44 was built in 1974 it was situated just north but attached. During Buick City's time it was the main repair area for finished cars. |
No comments:
Post a Comment